Skip to content
Sectors

Data centres and critical facilities

A data centre is judged on one day: the integrated systems test.

Data centres need the disciplines we already deliver, to a higher standard of redundancy and testing: HV and LV distribution with generators and UPS, chilled-water plant, fire suppression and controls, commissioned level by level up to the integrated systems test. Our record in critical power and cooling, from HV and LV works on Empower’s live chiller plants to DEWA substations, is where we start.

Data centres and critical facilities
5related critical power and cooling projects from other sectorsAs at October 2026
What matters to you

What clients in this sector need from their MEP contractor.

  1. 01

    Redundancy that holds

    Dual power paths, N+1 plant and the discipline to keep them separate on site.

  2. 02

    Commissioning to level 5

    Every system proven alone, then all of them together under simulated load and failure.

  3. 03

    Speed to power

    Long-lead equipment, approvals and the substation planned so the IT load can arrive on time.

What we deliver

The systems we install for this sector.

Projects

Related critical power and cooling work.

We have no data-centre project of our own to show yet. These projects, from other sectors, use the critical power and cooling systems a data centre depends on.

Your contact

One person who knows your sector.

Critical facilities leadData centres and critical facilities leadcritical@azemco.com
Contact
Start a project

Tell us what you are building.

Our data centres and critical facilities lead replies with the approvals involved, a programme and a priced proposal.