Skip to content
MEP services

Electrical systems

Power that is ready on the day the building needs it.

We design and install the electrical systems that run a building: LV distribution, small power and containment, lighting and controls, earthing and lightning protection, and standby power. As a DEWA-approved contractor we prepare the submissions, attend the inspections and energise the installation with DEWA, so the building is connected on the date the programme needs.

Electrical systems
projects in our record include electrical systems
35
As at October 2026
of them under construction now
12
As at October 2026
What we deliver

The scope we design, install and test.

Our electrical teams work in towers, factories, warehouses, hotels and plants, on design and build contracts and on build-only packages to the consultant’s design.

  • LV distributionMain LV switchboards, motor control centres, sub-main and final distribution boards, busbar trunking and cabling, built and tested to IEC 61439.
  • Containment and small powerCable trays, ladders, trunking and conduit, and the outlets and isolators every other trade needs, coordinated in one model.
  • Lighting and controlsInterior, façade, landscape and emergency lighting, including cold-cathode and feature lighting, with DALI or KNX control.
  • Standby and critical powerGenerators, automatic transfer switches and UPS systems, with their alarms and status on the BMS.
  • Earthing and lightning protectionEarth pits and grids, equipotential bonding and lightning protection to BS EN 62305.
  • Fire alarm, telephone and fibreFire alarm and life-safety supplies with our fire team, telephone and fibre backbones, and instrumentation cabling for plants.
  • DEWA connectionLoad approval, drawing submissions, inspections and energisation with DEWA.
How we work

What makes the difference on this discipline.

Designed to DEWA’s rules from the first drawing

Load schedules, cable sizing, voltage-drop and discrimination studies are prepared to DEWA’s regulations, so drawings are approved at the first submission and the energisation date holds.

Tested before anything is energised

Insulation resistance, continuity, polarity, RCD and protection tests on every circuit, with the results issued in the format DEWA’s inspectors ask for.

Standards we work to
  • DEWA Regulations for Electrical Installations
  • IEC 61439, low-voltage switchgear and controlgear assemblies
  • BS 7671 and IEC 60364, wiring practice
  • BS EN 62305, lightning protection
  • Dubai Building Code
Projects

Where we have delivered it.

35 projects in our record include electrical systems. These 6 show the range.

Questions clients ask

Before you appoint us.

Do you handle DEWA approvals and energisation?

Yes. We submit the load approval and the drawings, book and attend the inspections, and energise with DEWA. Give us the target energisation date and we plan the submissions back from it.

Can you design the system as well as install it?

Yes. On design and build contracts our engineers design the electrical systems; on build-only contracts they prepare the shop drawings from the consultant’s design.

Do you supply the switchgear and generators?

Yes, from makes on the consultant’s approved list, ordered early and tracked against the programme.

Your contact
Head of ElectricalElectrical systems leadelectrical@azemco.com
Contact

Answers technical questions, reviews tender scopes and stays with each project through handover.

Start a project

Planning an MEP package?

Send the drawings, the BOQ or just the brief. Our electrical systems team replies with the approvals involved, a programme and a priced proposal.