Every system a building needs to run, from one MEP contractor.
AZEMCO designs, installs, commissions and maintains eight MEP disciplines with its own engineers and trades. Each is a specialism in its own right, and each is coordinated with the others in one model and tested with them before handover, because a building is only ready when every system works together.
Appoint us for a complete MEP package on design and build or to the consultant’s design, or for one discipline.

- projects in our record with MEP works
- 50
- As at October 2026
- of them under construction now
- 12
- As at October 2026
- DEWA-approved LV/MV contractors in Dubai
- 1 of 13
- of solar PV built
- 6,349 kWp
- As at October 2026
Eight disciplines, one coordinated installation.
Choose a discipline for its scope, the approvals and standards that govern it, and the projects where we have delivered it.

Electrical systems
Power distribution, lighting, earthing and standby power, from the main switchboard to the final circuit.
Explore
Networks and substations
11 kV networks, substations and transformers, cable laying and termination, testing and maintenance.
Explore
HVAC and district cooling
Chilled water, air distribution, ventilation and smoke control, chiller plants and district cooling ETS rooms.
Explore
Plumbing, drainage and LPG
Water supply and booster sets, hot water, drainage and storm water, LPG systems and pool equipment.
Explore
Fire protection and life safety
Sprinklers, fire pumps, risers and hydrants, fire alarm and voice evacuation, taken through Civil Defence approval.
Explore
BMS, ELV and smart buildings
Building management systems, CCTV and access control, data networks, PA and lighting control.
Explore
Solar PV and energy efficiency
Rooftop and carport solar under Shams Dubai, and LED and BMS retrofits that cut energy use.
Explore
Operation and maintenance
Planned and reactive maintenance for substations, building MEP systems and solar plants.
ExploreThe handovers between trades are where programmes slip.
- 01
One coordinated installation
Electrical, mechanical, plumbing, fire and controls are designed and installed by one team in one model, so the trades do not wait for each other.
- 02
Approvals planned from day one
DEWA, Civil Defence, the district cooling provider and the municipality are in the programme from the first drawing, with each inspection booked rather than awaited.
- 03
Proven together before handover
Five levels of commissioning end with the integrated test: every system tested together, including a power failure and a fire scenario.
Every system in one building.
Watch a Dubai tower come together from the utility trench to the roof plant, then switch each system on yourself: lights, power, cooling, water, fire, controls and solar.
A 28-second animated film. An aerial view of Dubai at dusk closes in on a waterfront tower. Its facade turns transparent to show the structure, the utility trench under the street and the systems inside: power, cooling, water, fire, controls and solar. At the end you can switch each system on.
Drag to look around. Each label links to the capability behind it.
Approved by the authorities that sign off MEP work in Dubai.
Each approval is listed in our register with its category, number and expiry date.
- DEWAApproved LV/MV electrical contractorListed
- DEWAApproval for private 11 kV cable layingListed
- DEWAShams Dubai enrolled solar PV contractorListed
- EmpowerSole approved MEP contractor for MV, LV and HV worksListed
- ISO certificationISO 9001:2015, quality managementRenewal due in 68 days
- ISO certificationISO 45001:2018, occupational health and safetyRenewal due in 68 days
MEP we have delivered.
50 projects in our record include MEP works. These six show the range.

Jebel Ali Village South End Residences
Complete MEP works for a multi-block residential development for Wasl.
View project
DTA ship engineering warehouse
Full civil and MEP works for a G+4 ship engineering warehouse and office building.
View project
Empower semi-permanent chiller plants
HV and LV electrical works across multiple district cooling plants, under repeat orders.
View project
Mina Rashid Marina, Phases 2 and 3
Cabling and firefighting network works for DP World, including the 11 kV networks of Phase 3, completed in February 2019.
View project
Dubai Airports building retrofit, Phase 1
BMS and mechanical retrofit, delivered with Siemens.
View project
Solar PV portfolio
Design, build and O&M of rooftop and carport solar PV plants: 6,349 kWp in all, from a 158 kWp mosque roof to a 2.8 MWp plant in Al Quoz.
View projectTell us about your MEP package.
A complete package or a single discipline, design and build or to the consultant’s design. Our estimation team replies within two working days.