BMS, ELV and smart buildings
The system that ties the others together.
A building management system controls the plant, meters the energy and raises the alarms, and it is where savings in energy and maintenance are made. We install and integrate BMS, CCTV, access control, structured cabling, public address and lighting control, and test every point from the field device to the operator’s screen.

- projects in our record include BMS, ELV and smart buildings
- 13
- As at October 2026
- of them under construction now
- 5
- As at October 2026
The scope we design, install and test.
At Dubai Airports we delivered a BMS and mechanical retrofit with Siemens, to bring down the energy used by the terminals’ systems.
- Building management systemsControllers, field devices, graphics and the integration of chillers, AHUs, pumps, meters and generators.
- Energy meteringElectrical and BTU meters on the BMS, for billing and energy reporting.
- CCTV and access controlIP CCTV, video recording and access control.
- Structured cabling and networksCopper and fibre backbones, racks and patching, tested and certified.
- Public address and intercomPA, intercom, IPTV and audio-visual systems.
- Lighting control and automationDALI and KNX control, scenes and schedules, integrated with the BMS.
What makes the difference on this discipline.

Every point tested end to end
Point-to-point tests run from each field device to its graphic, witnessed by the consultant, before the system goes live.

Retrofits that pay back
Upgrading the controls of an existing building is often the cheapest energy saving available. We survey, retrofit and measure the result.
- BACnet and Modbus integration
- SIRA requirements for security systems
- ANSI/TIA-568, structured cabling
Where we have delivered it.
13 projects in our record include BMS, ELV and smart buildings. These 6 show the range.

Jebel Ali Village South End Residences
Complete MEP works for a multi-block residential development for Wasl.
View project
FedEx Sort and Clearance Facility
Design and build MEP for FedEx’s first sort facility in Dubai, with district cooling plant and ETS room.
View project
Dubai Airports building retrofit, Phase 1
BMS and mechanical retrofit, delivered with Siemens.
View project
Pharmaceutical formulation plant, JAFZA
MEP works for a new pharmaceutical formulation plant.
View project
Al Anbar waterfront infrastructure
HV, LV and ELV works.
View project
Levanto by ORO24
Complete MEP works for a 2B+G+3P+16 residential and commercial building.
View projectBefore you appoint us.
Do you integrate third-party equipment?
Yes. We integrate chillers, generators, lifts and meters over BACnet and Modbus, with the interface list agreed at the start.
Can you upgrade the BMS in an occupied building?
Yes. The Dubai Airports retrofit was carried out inside working terminals.
Answers technical questions, reviews tender scopes and stays with each project through handover.
Planning an MEP package?
Send the drawings, the BOQ or just the brief. Our BMS, ELV and smart buildings team replies with the approvals involved, a programme and a priced proposal.