Rail, roads and public realm · Completed
Al Anbar waterfront infrastructure
HV, LV and ELV works.

- Client
- Al Anbar
- Consultant
- Dar Al Handasah
- Main contractor
- Ghantoot Gulf Contracting
- AZEMCO role
- Electrical contractor
- Location
- Dubai
- Status
- Completed
- Contract value
- AED 2.6M

AED 2.6Mcontract value
3services in one contract
Handed overand in operation
What we did
Built, tested and handed over.
AZEMCO was the electrical contractor on Al Anbar waterfront infrastructure for Al Anbar, with Dar Al Handasah as consultant and Ghantoot Gulf Contracting as main contractor. HV, LV and ELV works. The work covered networks and substations, electrical systems and bms, elv and smart buildings.
Related projects
More in rail, roads and public realm.

Etihad Rail Stage 2, Package 2D
- Client
- Etihad Rail
- Consultant
- Jacobs
- Main contractor
- CRCC NPC JV
- Value
- AED 7M
GRP pipeline, lighting and civil works.
- Pipelines and drainage
- Street and high-mast lighting
- Utility networks

Sheikh Khalifa Road (E88) upgrade
- Client
- Ministry of Presidential Affairs
- Consultant
- Core Engineering Consultancy
- Main contractor
- Pioneer Contracting and China State Construction Middle East
- Value
- AED 3.9M
LV and street lighting.
- Networks and substations
- Street and high-mast lighting

132 kV and 11 kV diversions, E611
- Client
- DEWA / Etihad Rail
- Consultant
- Jacobs
- Main contractor
- Larsen & Toubro Power China JV
- Value
- AED 2.3M
Ducts, lowering and protection of 132 kV and 11 kV cables, under two orders.
- Networks and substations
- Utility networks