Sheikh Khalifa Road (E88) upgrade
LV and street lighting.

- Client
- Ministry of Presidential Affairs
- Consultant
- Core Engineering Consultancy
- Main contractor
- Pioneer Contracting and China State Construction Middle East
- AZEMCO role
- Electrical contractor
- Location
- Northern Emirates
- Status
- Completed
- Contract value
- AED 3.9M

Built, tested and handed over.
AZEMCO was the electrical contractor on Sheikh Khalifa Road (E88) upgrade for Ministry of Presidential Affairs, with Core Engineering Consultancy as consultant and Pioneer Contracting and China State Construction Middle East as main contractor. LV and street lighting. The work covered networks and substations and street and high-mast lighting.
More in rail, roads and public realm.

Etihad Rail Stage 2, Package 2D
- Client
- Etihad Rail
- Consultant
- Jacobs
- Main contractor
- CRCC NPC JV
- Value
- AED 7M
GRP pipeline, lighting and civil works.
- Pipelines and drainage
- Street and high-mast lighting
- Utility networks

Al Anbar waterfront infrastructure
- Client
- Al Anbar
- Consultant
- Dar Al Handasah
- Main contractor
- Ghantoot Gulf Contracting
- Value
- AED 2.6M
HV, LV and ELV works.
- Networks and substations
- Electrical systems
- BMS, ELV and smart buildings

132 kV and 11 kV diversions, E611
- Client
- DEWA / Etihad Rail
- Consultant
- Jacobs
- Main contractor
- Larsen & Toubro Power China JV
- Value
- AED 2.3M
Ducts, lowering and protection of 132 kV and 11 kV cables, under two orders.
- Networks and substations
- Utility networks
Planning a similar project?
Tell us the scope and the programme. We reply with the approvals involved, a programme and a priced proposal.