Health and safety

Everyone on our sites goes home safe, every day.

An MEP site combines live electrical systems, work at height, hot work, confined spaces and deep excavations, often on the same day. We plan each of them before work starts, train our people for them, and publish how well we do.

The manual

Health and Safety Manual

AZ-HSE-MAN-01 · Revision 0, October 202622 pages · PDF on request

Certified to ISO 45001:2018Certificate valid to 28 December 2026

Our policy and how we put it into practice: risk assessment, permits to work, electrical safety, high-risk work, heat stress, welfare, training, emergencies, incidents and how we measure ourselves.

The first two pages can be read here. The full manual is emailed to you once we approve your request.

Published for information only. The manual describes our system and the standards we aim to achieve. It is not part of any contract, creates no obligation or liability for AZEMCO, and is not to be used in any claim or dispute.

Inside the manual · 19 chapters and 3 appendices
  1. 1Our health and safety policy
  2. 2Scope and structure
  3. 3Legal and other requirements
  4. 4Leadership and responsibilities
  5. 5Worker participation and consultation
  6. 6Hazard identification and risk assessment
  7. 7Permit to work
  8. 8Electrical safety
  9. 9High-risk activities
  10. 10Heat stress
  11. 11Health, welfare and fitness for work
  12. 12Competence, induction and training
  13. 13Personal protective equipment
  14. 14Subcontractors and suppliers
  15. 15Driving, security and change
  16. 16Emergency preparedness and response
  17. 17Incident reporting and investigation
  18. 18Monitoring, inspection and audit
  19. 19Objectives and improvement
In short

Six controls on every AZEMCO site.

The manual explains each of them, with the permits, the training and the checks behind it.

  • Permit to workHot work, work at height, confined spaces, excavations and electrical work all need a permit, issued and closed by a competent supervisor.
  • Proven dead before workIsolation, lock-out and tag-out, and a test for dead before any conductor is touched. Live working is not permitted.
  • Services found before diggingUtility drawings, cable locators and hand-dug trial pits before any machine excavates near existing services.
  • Heat stressOutdoor work stops for the midday break from 15 June to 15 September, with cool rest areas, water and electrolytes on every site.
  • Stop-work authorityAnyone on an AZEMCO site can stop a job they believe is unsafe, without blame.
  • Training and competenceSite induction for everyone, daily toolbox talks, and recognised safety qualifications for supervisors.
Our standards