Skip to content
Sustainability

Clean energy we have built, and energy our clients no longer use.

Our biggest contribution is in the work itself: solar plants we design, build and maintain, and retrofits that cut the energy existing buildings use. We are also reducing the footprint of our own sites and fleet.

The manual

Sustainability Manual

AZ-ENV-MAN-01 · Revision 0, October 202614 pages · PDF on request

Certified to ISO 14001:2015Certificate valid to 28 December 2026

How we manage dust, noise, waste, water, refrigerants and energy on our sites, the clean energy we build for our clients, and the aims we are working towards.

The first two pages can be read here. The full manual is emailed to you once we approve your request.

Published for information only. The manual describes our system and the standards we aim to achieve. It is not part of any contract, creates no obligation or liability for AZEMCO, and is not to be used in any claim or dispute.

Inside the manual · 12 chapters and 2 appendices
  1. 1Our sustainability and environmental policy
  2. 2Scope and context
  3. 3Responsibilities
  4. 4Environmental aspects and impacts
  5. 5Compliance obligations
  6. 6Controls on site
  7. 7Energy and carbon
  8. 8Sustainable projects for our clients
  9. 9Sustainable procurement
  10. 10People and community
  11. 11Competence, communication and emergencies
  12. 12Performance and improvement
What we have delivered

Measured outcomes, not pledges.

6,349 kWpof solar PV builtAs at October 2026
9solar plants in our O&M portfolio, Dubai Airports included
2DEWA power stations with refurbished lighting: Jebel Ali and Al AwirAs at October 2026
In short

How we run our own sites.

Six controls the manual sets out in full, with the aims we measure ourselves against. Aims, not promises.

  • WasteSegregated on every site. Cable offcuts, metals, drums and pallets are reused or recycled; hazardous waste leaves with licensed contractors only.
  • Fuel and powerSites connected to the grid early to cut generator hours, with plant and vehicles maintained and routes planned.
  • RefrigerantsHandled only by certified technicians with recovery equipment, never vented, and every charge recorded.
  • SpillsFuel and chemicals kept in bunded stores with spill kits beside them. Any spill is contained, cleaned up and reported.
  • Dust, noise and neighboursDamped haul roads, covered loads and silenced plant, with noisy work kept to the permitted hours.
  • WaterFlushing and tests planned so they are not repeated, with water reused where the specification and the authority allow.
Our standards

The other four.

Start a project

Planning a solar plant or an energy retrofit?

Tell us about the building or the roof. We reply with the approvals involved, a programme and a priced proposal.