Solar PV and energy efficiency
Energy you generate, and energy you no longer use.
We design, build and maintain rooftop and carport solar PV plants as a DEWA-enrolled solar contractor under Shams Dubai, and retrofit existing buildings to use less energy with LED lighting, BMS upgrades and mechanical improvements. About 6.3 MWp of solar PV, and energy retrofits at Dubai Airports and two DEWA power stations, are on our record.

- projects in our record include solar PV and energy efficiency
- 4
- As at October 2026
- of them under construction now
- 0
- As at October 2026
- of solar PV built
- 6,349 kWp
- As at October 2026
The scope we design, install and test.
We are a Signify (formerly Philips Lighting) qualified installer, and delivered the Dubai Airports LED retrofit with Signify.
- Rooftop solar PVGrid-connected rooftop plants, designed, approved and connected under Shams Dubai.
- Solar carportsSteel carport structures with PV modules, cabling, inverters and the connection.
- Energy retrofitsLED lighting, BMS and mechanical retrofits, with the savings measured.
- Solar operation and maintenanceCleaning, inspection, monitoring and repairs that keep the yield up.
What makes the difference on this discipline.

From design to the Shams Dubai connection
Design, DEWA approvals, inspection and connection, then monitoring, by one team.

Savings you can measure
Retrofits start with a survey and end with a measured result, so the client can see the payback.
- DEWA standards for distributed renewable resources generators
- IEC 61215 and IEC 61730, PV modules
- IEC 62446, testing and documentation of PV systems
Where we have delivered it.
4 projects in our record include solar PV and energy efficiency.

Dubai Airports building retrofit, Phase 1
BMS and mechanical retrofit, delivered with Siemens.
View project
Solar PV portfolio
Design, build and O&M of rooftop and carport solar PV plants: 6,349 kWp in all, from a 158 kWp mosque roof to a 2.8 MWp plant in Al Quoz.
View project
Dubai Airports lighting retrofit, Phase 1
LED lighting retrofit, delivered with Signify.
View project
Jebel Ali and Al Awir power stations
Lighting refurbishment at two power stations.
View projectBefore you appoint us.
Are you enrolled with DEWA for solar?
Yes, as a solar PV contractor under Shams Dubai.
Can you maintain a plant someone else built?
Yes. Our O&M portfolio includes plants at Dubai Airports that we maintain but did not build.
Answers technical questions, reviews tender scopes and stays with each project through handover.
Planning an MEP package?
Send the drawings, the BOQ or just the brief. Our solar PV and energy efficiency team replies with the approvals involved, a programme and a priced proposal.