Power and renewable energy · Completed

132/11 kV substations, section B

132 kV trough installation and cable laying.

Delivered for
132/11 kV substations, section B
Client
DEWA
Consultant
Khatib & Alami
Main contractor
Ghantoot Transport & General Contracting
AZEMCO role
Cable contractor
Location
Dubai
Status
Completed
Contract value
AED 4M
132/11 kV substations, section B
Photograph
Typical utility trench section with 132 kV cables, 11 kV ducts and a GRP pipeUTILITY CORRIDOR · TYPICAL TRENCH SECTIONRoad132 kV in trefoil11 kV ductsDN 600GRP pipeBackfill in300 mm layersWarning tapeSand bed2.40 m3.70 m
Engineering drawing · illustrative
AED 4Mcontract value
2services in one contract
Handed overand in operation
What we did

Built, tested and handed over.

AZEMCO was the cable contractor on 132/11 kV substations, section B for DEWA, with Khatib & Alami as consultant and Ghantoot Transport & General Contracting as main contractor. 132 kV trough installation and cable laying. The work covered networks and substations and utility networks.