Power and renewable energy · Completed

11 kV works, Palm Jumeirah

11 kV cables, transformers and earthing.

Delivered for
11 kV works, Palm Jumeirah
Client
Nakheel
Consultant
Parsons
Main contractor
Power Advantage
AZEMCO role
Electrical contractor
Location
Palm Jumeirah, Dubai
Status
Completed
Contract value
AED 3.5M
11 kV works, Palm Jumeirah
Photograph
Single-line diagram of an 11 kV to 0.4 kV substation11 KV / 0.4 KV SUBSTATION · SINGLE-LINE DIAGRAMDEWA 11 kV ringto next RMURMUTX 1500 kVA11 / 0.433 kV · Dyn11ACB 2500 AMDB · 2500 A · 50 kASMDBApartmentsMCCHVACLifts4 × 22 kWPumpsBoosterCar parkVentilationATSGDG 500 kVAFire pumpsSmoke fansLife-safety loads held on the generator through the ATS
Engineering drawing · illustrative
AED 3.5Mcontract value
1service
Handed overand in operation
What we did

Built, tested and handed over.

AZEMCO was the electrical contractor on 11 kV works, Palm Jumeirah for Nakheel, with Parsons as consultant and Power Advantage as main contractor. 11 kV cables, transformers and earthing. The work covered networks and substations.