Power and renewable energy
Your network stays live while we work on it.
Utilities appoint contractors they trust on live assets. DEWA has appointed us for 132/11 kV substation works, 11 kV and LV cable diversions and the lighting refurbishment at the Jebel Ali and Al Awir power stations; Nakheel for 11 kV networks on Palm Jumeirah. And we build and maintain solar PV plants under Shams Dubai.

What clients in this sector need from their MEP contractor.
- 01
Work on live assets
Permits, isolations and switching are agreed with the operator’s control room before anyone starts.
- 02
The operator’s specification
Enrolment, specifications and witnessed tests are the operator’s, and we work to them.
- 03
Repeat orders, the same standard
Call-off and repeat work, delivered by the same teams to the same standard every time.
The systems we install for this sector.

Networks and substations
11 kV networks, substations and transformers, cable laying and termination, testing and maintenance.
Explore
Solar PV and energy efficiency
Rooftop and carport solar under Shams Dubai, and LED and BMS retrofits that cut energy use.
Explore
Electrical systems
Power distribution, lighting, earthing and standby power, from the main switchboard to the final circuit.
Explore
Operation and maintenance
Planned and reactive maintenance for substations, building MEP systems and solar plants.
Explore
Utility networks
Excavation, cable trenches and duct banks, road crossings, diversions and reinstatement.
ExploreDelivered for clients like you.
5 projects in our record in this sector.

Solar PV portfolio
Design, build and O&M of rooftop and carport solar PV plants: 6,349 kWp in all, from a 158 kWp mosque roof to a 2.8 MWp plant in Al Quoz.
View project
Jebel Ali and Al Awir power stations
Lighting refurbishment at two power stations.
View project
132/11 kV substations, section B
132 kV trough installation and cable laying.
View project
11 kV works, Palm Jumeirah
11 kV cables, transformers and earthing.
View project
11 kV and LV cable diversion
Lowering, protection and laying of 11 kV and LV cables, for DEWA.
View projectOne person who knows your sector.
Tell us what you are building.
Our power and renewable energy lead replies with the approvals involved, a programme and a priced proposal.