Weatherford facility and training centre, Abu Dhabi
Design and build MEP for Weatherford’s manufacturing facility and training centre in Abu Dhabi, including the HV distribution and the facility’s own substation.
- Client
- Weatherford
- Main contractor
- City Diamond
- Consultant
- Spec
- Location
- Abu Dhabi
- Our role
- Design and build
- Contract value
- AED 54M
- Status
- Completed

A factory with its own substation.
Weatherford needed a manufacturing facility and a training centre in Abu Dhabi, served by their own HV distribution and substation. AZEMCO was appointed to design and build the complete MEP, with City Diamond as main contractor and Spec as consultant.
- HV distribution and a substation sized for production
- Building services for a manufacturing hall and a training centre
- One contract, and one party responsible, for all of it
What made it hard.
- 01
Its own substation
The production loads called for the facility’s own HV distribution and substation, designed and built alongside the building rather than after it.
- 02
Two kinds of building
A manufacturing hall and a training centre need very different cooling, ventilation, lighting and fire protection.
- 03
Abu Dhabi’s requirements
Work in Abu Dhabi follows its own utility and Civil Defence requirements, which differ from Dubai’s.
What we did about each one.
- Challenge 01Its own substationOur response
HV designed with the building
We designed the HV distribution and the substation with the building services, so the supply, the transformers and the main switchgear were sized for the production loads from the start.
- Challenge 02Two kinds of buildingOur response
Services for each use
Our engineers designed the hall and the training centre separately, each with its own cooling, ventilation, lighting and fire protection, from shared plant where it made sense.
- Challenge 03Abu Dhabi’s requirementsOur response
Approvals planned from the first drawing
We built the submissions to the Abu Dhabi authorities into the design programme, so approvals were in place before installation began.
From the first drawing to handover.
- 01DesignHV distribution, substation and building services designed together.
- 02ApprovalsSubmissions to the Abu Dhabi utility and Civil Defence.
- 03ProcurementTransformers, switchgear and plant ordered against the programme.
- 04InstallationSubstation, distribution and building services installed.
- 05Energisation and handoverThe substation energised, every system tested and the facility handed over.
One design and build contract for the facility, its substation and the training centre.
- One contract for the facility, its substation and the training centre