Weatherford facility and training centre, Abu Dhabi

Design and build MEP for Weatherford’s manufacturing facility and training centre in Abu Dhabi, including the HV distribution and the facility’s own substation.

Delivered for
Client
Weatherford
Main contractor
City Diamond
Consultant
Spec
Location
Abu Dhabi
Our role
Design and build
Contract value
AED 54M
Status
Completed
Weatherford facility and training centre, Abu Dhabi
AED 54Mcontract value
5services in one contract
Handed overand in operation
The brief

A factory with its own substation.

Weatherford needed a manufacturing facility and a training centre in Abu Dhabi, served by their own HV distribution and substation. AZEMCO was appointed to design and build the complete MEP, with City Diamond as main contractor and Spec as consultant.

What the client needed
  • HV distribution and a substation sized for production
  • Building services for a manufacturing hall and a training centre
  • One contract, and one party responsible, for all of it
The challenges

What made it hard.

  1. 01

    Its own substation

    The production loads called for the facility’s own HV distribution and substation, designed and built alongside the building rather than after it.

  2. 02

    Two kinds of building

    A manufacturing hall and a training centre need very different cooling, ventilation, lighting and fire protection.

  3. 03

    Abu Dhabi’s requirements

    Work in Abu Dhabi follows its own utility and Civil Defence requirements, which differ from Dubai’s.

How we solved them

What we did about each one.

  1. Challenge 01Its own substation
    Our response

    HV designed with the building

    We designed the HV distribution and the substation with the building services, so the supply, the transformers and the main switchgear were sized for the production loads from the start.

  2. Challenge 02Two kinds of building
    Our response

    Services for each use

    Our engineers designed the hall and the training centre separately, each with its own cooling, ventilation, lighting and fire protection, from shared plant where it made sense.

  3. Challenge 03Abu Dhabi’s requirements
    Our response

    Approvals planned from the first drawing

    We built the submissions to the Abu Dhabi authorities into the design programme, so approvals were in place before installation began.

How the work ran

From the first drawing to handover.

  1. 01DesignHV distribution, substation and building services designed together.
  2. 02ApprovalsSubmissions to the Abu Dhabi utility and Civil Defence.
  3. 03ProcurementTransformers, switchgear and plant ordered against the programme.
  4. 04InstallationSubstation, distribution and building services installed.
  5. 05Energisation and handoverThe substation energised, every system tested and the facility handed over.
The result

One design and build contract for the facility, its substation and the training centre.

What changed
  • One contract for the facility, its substation and the training centre
Start a project

Planning a similar project?

Tell us the scope and the programme. We reply with the approvals involved, a programme and a priced proposal.