Shindagha Tunnel lighting

Lighting works in the Shindagha Tunnel, for the RTA.

Delivered for
Shindagha Tunnel lighting
Client
RTA
Consultant
Khatib & Alami
Main contractor
Philips
AZEMCO role
Lighting contractor
Location
Al Shindagha, Dubai
Status
Completed
Contract value
AED 1M
Shindagha Tunnel lighting
Photograph
Single-line diagram of an 11 kV to 0.4 kV substation11 KV / 0.4 KV SUBSTATION · SINGLE-LINE DIAGRAMDEWA 11 kV ringto next RMURMUTX 1500 kVA11 / 0.433 kV · Dyn11ACB 2500 AMDB · 2500 A · 50 kASMDBApartmentsMCCHVACLifts4 × 22 kWPumpsBoosterCar parkVentilationATSGDG 500 kVAFire pumpsSmoke fansLife-safety loads held on the generator through the ATS
Engineering drawing · illustrative
AED 1Mcontract value
2services in one contract
Handed overand in operation
What we did

Built, tested and handed over.

AZEMCO was the lighting contractor on Shindagha Tunnel lighting for RTA, with Khatib & Alami as consultant and Philips as main contractor. Lighting works in the Shindagha Tunnel, for the RTA. The work covered electrical systems and street and high-mast lighting.