Rail, roads and public realm · Completed

DEWA power supply to 25 bus shelters, JAFZA

Electrical works for the DEWA power supply to 25 bus shelters across JAFZA, as main contractor.

Delivered for
DEWA power supply to 25 bus shelters, JAFZA
Client
DP World
Consultant
Al Turath Engineering Consultant
Main contractor
AZEMCO (main contractor)
AZEMCO role
Main contractor
Location
Jebel Ali Free Zone, Dubai
Status
Completed
Contract value
AED 1.5M
DEWA power supply to 25 bus shelters, JAFZA
Photograph
Single-line diagram of an 11 kV to 0.4 kV substation11 KV / 0.4 KV SUBSTATION · SINGLE-LINE DIAGRAMDEWA 11 kV ringto next RMURMUTX 1500 kVA11 / 0.433 kV · Dyn11ACB 2500 AMDB · 2500 A · 50 kASMDBApartmentsMCCHVACLifts4 × 22 kWPumpsBoosterCar parkVentilationATSGDG 500 kVAFire pumpsSmoke fansLife-safety loads held on the generator through the ATS
Engineering drawing · illustrative
AED 1.5Mcontract value
2services in one contract
Handed overand in operation
What we did

Built, tested and handed over.

AZEMCO was the main contractor on DEWA power supply to 25 bus shelters, JAFZA for DP World, with Al Turath Engineering Consultant as consultant. Electrical works for the DEWA power supply to 25 bus shelters across JAFZA, as main contractor. The work covered electrical systems and utility networks.