Furnace and LEHR rebuild
MEP works for the rebuild of a glass furnace and LEHR.

- Client
- Al Tajir Glass
- Consultant
- Spec
- Main contractor
- AZEMCO (main contractor)
- AZEMCO role
- MEP contractor
- Sector
- Industrial and logistics
- Location
- Dubai
- Status
- Completed
- Contract value
- AED 8M

Built, tested and handed over.
AZEMCO was the main contractor on Furnace and LEHR rebuild for Al Tajir Glass, with Spec as consultant. MEP works for the rebuild of a glass furnace and LEHR. The work covered electrical systems and hvac and district cooling.
More in industrial and logistics.

DTA ship engineering warehouse
- Client
- DTA
- Consultant
- Al Anwar
- Main contractor
- AZEMCO (main contractor)
- Value
- AED 12M
Full civil and MEP works for a G+4 ship engineering warehouse and office building.
- Electrical systems
- HVAC and district cooling
- Plumbing, drainage and LPG
- Fire protection and life safety
- Civil and building works

FedEx Sort and Clearance Facility
- Client
- Dubai South / FedEx
- Consultant
- Plant Quadrant
- Main contractor
- RAQ Contracting
- Value
- AED 60M
Design and build MEP for FedEx’s first sort facility in Dubai, with district cooling plant and ETS room.
- Electrical systems
- HVAC and district cooling
- Plumbing, drainage and LPG
- Fire protection and life safety
- BMS, ELV and smart buildings

Weatherford facility and training centre, Abu Dhabi
- Client
- Weatherford
- Consultant
- Spec
- Main contractor
- City Diamond
- Value
- AED 54M
Design and build MEP for the manufacturing facility and training centre, including HV distribution and substation.
- Electrical systems
- Networks and substations
- HVAC and district cooling
- Plumbing, drainage and LPG
- Fire protection and life safety
Planning a similar project?
Tell us the scope and the programme. We reply with the approvals involved, a programme and a priced proposal.