Industrial fire hydrant network, Dubai Maritime City
Design and build of an industrial fire hydrant system.

- Client
- Dubai Maritime City
- Consultant
- Al Turath Engineering Consultant
- Main contractor
- AZEMCO (main contractor)
- AZEMCO role
- Design and build
- Sector
- Ports and maritime
- Location
- Dubai Maritime City
- Status
- Completed
- Contract value
- AED 13.25M


Built, tested and handed over.
AZEMCO was the main contractor on Industrial fire hydrant network, Dubai Maritime City for Dubai Maritime City, with Al Turath Engineering Consultant as consultant. Design and build of an industrial fire hydrant system. The work covered fire protection and life safety and pipelines and drainage.
More in ports and maritime.

Mina Rashid Marina, Phases 2 and 3
- Client
- DP World
- Consultant
- NEO Engineering Consultants
- Main contractor
- Shafa Al Nahdah
- Value
- AED 20M
Cabling and firefighting network works for DP World, including the 11 kV networks of Phase 3, completed in February 2019.
- Networks and substations
- Fire protection and life safety
- Utility networks
- Pipelines and drainage

CT3 empty yard, Jebel Ali
- Client
- DP World
- Consultant
- Al Turath Engineering Consultant
- Main contractor
- Al Banna Engineering
- Value
- AED 3M
LV, high mast and firefighting.
- Networks and substations
- Utility networks
Planning a similar project?