Ports and maritime · Completed

CT3 empty yard, Jebel Ali

LV, high mast and firefighting.

Delivered for
CT3 empty yard, Jebel Ali
Client
DP World
Consultant
Al Turath Engineering Consultant
Main contractor
Al Banna Engineering
AZEMCO role
Electrical and firefighting contractor
Location
Jebel Ali, Dubai
Status
Completed
Contract value
AED 3M
CT3 empty yard, Jebel Ali
Photograph
Single-line diagram of an 11 kV to 0.4 kV substation11 KV / 0.4 KV SUBSTATION · SINGLE-LINE DIAGRAMDEWA 11 kV ringto next RMURMUTX 1500 kVA11 / 0.433 kV · Dyn11ACB 2500 AMDB · 2500 A · 50 kASMDBApartmentsMCCHVACLifts4 × 22 kWPumpsBoosterCar parkVentilationATSGDG 500 kVAFire pumpsSmoke fansLife-safety loads held on the generator through the ATS
Engineering drawing · illustrative
AED 3Mcontract value
2services in one contract
Handed overand in operation
What we did

Built, tested and handed over.

AZEMCO was the electrical and firefighting contractor on CT3 empty yard, Jebel Ali for DP World, with Al Turath Engineering Consultant as consultant and Al Banna Engineering as main contractor. LV, high mast and firefighting. The work covered networks and substations and utility networks.