Pipelines, drainage and hydrant networks
Pipe that is tested before it is buried.
We lay GRP and HDPE pipelines, storm-water and drainage networks, and fire hydrant mains for infrastructure, industrial and port clients, and test them before backfill. On Etihad Rail’s Stage 2 we delivered the GRP pipeline, lighting and civil works of Package 2D; at Dubai Maritime City we designed and built an industrial fire hydrant system.

- projects in our record include pipelines and drainage
- 3
- As at October 2026
- of them under construction now
- 0
- As at October 2026
The scope we design, install and test.
- GRP pipelinesLarge-diameter GRP pipe laying, jointing and testing.
- Storm water and drainageGravity and pumped networks, manholes and outfalls.
- Fire hydrant networksHydrant mains, hydrants and valves, pressure-tested and commissioned with our fire team.
- Water and irrigation mainsPotable, TSE and irrigation mains.
How we keep the work safe and the programme intact.

Tested before backfill
Hydrostatic tests, alignment and level checks are carried out and witnessed before any trench is closed.
- Dubai Municipality drainage and pipeline specifications
- UAE Fire and Life Safety Code of Practice, hydrant systems
- AWWA M45, fibreglass pipe design
Where we have delivered it.
3 projects in our record include pipelines and drainage.

Mina Rashid Marina, Phases 2 and 3
Cabling and firefighting network works for DP World, including the 11 kV networks of Phase 3, completed in February 2019.
View project
Etihad Rail Stage 2, Package 2D
GRP pipeline, lighting and civil works.
View project
Industrial fire hydrant network, Dubai Maritime City
Design and build of an industrial fire hydrant system.
View projectBefore you appoint us.
Do you supply the pipe?
Yes, from approved manufacturers, or we install client-supplied pipe to the manufacturer’s method.
Answers technical questions, reviews tender scopes and stays with each project through handover.
Planning civil works?
Send the drawings, the BOQ or just the brief. Our pipelines and drainage team replies with the approvals involved, a programme and a priced proposal.