Solar and Retrofit ManagerAZEMCOOctober 20262 min read

From a 158 kWp mosque roof in Hatta to a 2.8 MWp plant in Al Quoz: every plant connected to the DEWA network under Shams Dubai, and most of them maintained by us.

Our solar PV portfolio has reached about 6.3 MWp: plants on roofs and over car parks in Dubai, as well as residential buildings and villas, each connected to the DEWA network under Shams Dubai.

The largest plants

  • 2.8 MWp at AKH Al Quoz, installed, tested and commissioned for Siraj Power
  • 2,040 kWp at DEWA’s Warsan Central Store, designed and built by us, with three years of operation and maintenance
  • 930 kWp on a commercial building in Techno Park
  • 852 kWp at DEWA’s JAPS warehouse, with three years of operation and maintenance
  • 635 kWp at Dubai Airports, converted from off-grid to on-grid, with two years of maintenance

Six smaller plants, from 546 kWp in Al Quoz to 158 kWp on the roof of DEWA Hatta Mosque, make up the rest.

Built, then maintained

Four of the DEWA plants are in three-year operation and maintenance contracts with us. Dust is the main enemy of yield in the UAE, so cleaning cycles, inverter monitoring and thermographic checks keep each plant at its design output.

Solar PV portfolio

Share this story
Read next

More news and insights.

Company newsOctober 2026

New: build your building in 3D and get a proposal

Choose one of eleven kinds of building, set its size and the emirate, and watch it go up stage by stage with its cost. Then download a detailed proposal.

AZEMCONewsroom2 min read

Project updateOctober 2026

12 projects on site, AED 300M+ under construction

Residential buildings for ORO24, Danube Properties, Prescott and Wasl, a school for GEMS Education, a mosque at Pearl Jumeirah and a warehouse at Dubai Maritime City.

AZEMCONewsroom2 min read

Technical noteOctober 2026

What a DEWA LV/MV approval means for your programme

Approved contractors carry the submissions, inspections and energisation of 11 kV and LV works. Here is where that saves time, and where it does not.

Head of ElectricalAZEMCO4 min read
Related projects

From our project record.

Start a project

Tell us what you are building.

Send the drawings, the BOQ or just the brief. Our estimation team replies within two working days.