12 projects on site, AED 300M+ under construction
Residential buildings for ORO24, Danube Properties, Prescott and Wasl, a school for GEMS Education, a mosque at Pearl Jumeirah and a warehouse at Dubai Maritime City.
MEP contractor, with civil engineering under the same roof. Dubai, since 2004.

Choose one of eleven kinds of building, set its size and the emirate, and watch it go up stage by stage with its cost. Then download a detailed proposal.
Our website now has a builder. Choose a building and its size, say where it is, and choose whether we build all of it or only its MEP. The building then goes up in 3D, stage by stage, with the cost of each stage beside it. At the end you can download a proposal with the estimate, what it covers and the assumptions behind it, or copy a link to your build and share it.
Villas, residential towers, mixed-use developments, hotels, warehouses, industrial facilities, port terminals, data centres, district cooling plants, metro stations, and retrofits of existing buildings. Each asks only what matters for it: the floors and basements of a tower, the finish of a hotel, the IT load of a data centre, the capacity of a cooling plant.
The rates come from our study of full-build and MEP prices in the UAE in 2026. The type, the size, the finish and the emirate set the rate per square foot, and above 20 floors it rises step by step. The estimate lists the factors behind the price, so you can see how it was reached.
The estimate is for information only: it is not an offer and not part of any contract. For a firm price, send us your drawings or just the brief, and our estimation team will price the work properly within five working days.
Residential buildings for ORO24, Danube Properties, Prescott and Wasl, a school for GEMS Education, a mosque at Pearl Jumeirah and a warehouse at Dubai Maritime City.
From a 158 kWp mosque roof in Hatta to a 2.8 MWp plant in Al Quoz: every plant connected to the DEWA network under Shams Dubai, and most of them maintained by us.
Approved contractors carry the submissions, inspections and energisation of 11 kV and LV works. Here is where that saves time, and where it does not.



Send the drawings, the BOQ or just the brief. Our estimation team replies within two working days.