What a DEWA LV/MV approval means for your programme
Approved contractors carry the submissions, inspections and energisation of 11 kV and LV works. Here is where that saves time, and where it does not.
MEP contractor, with civil engineering under the same roof. Dubai, since 2004.

The energy transfer station is where the building meets the network. Most rejected inspections come down to four things.
An energy transfer station (ETS) separates the district cooling network from the building’s own chilled water system. The provider owns the primary side; the building owns the secondary side; the plate heat exchangers sit between them. Because the provider inspects before it connects, the ETS room is often on the critical path to handover.
We coordinate the ETS room in the model before the slab is poured, agree meter and sensor positions with the provider early, and treat flushing as a planned activity with its own records rather than a last-minute task. The aim is simple: one inspection, one connection.
Approved contractors carry the submissions, inspections and energisation of 11 kV and LV works. Here is where that saves time, and where it does not.
Carports turn parking into generation. What we have learned building and maintaining plants for DEWA.
Trenches, sleeves, plinths and builder’s work sit between two trades. Putting both under one contract removes the gap.


Send the drawings, the BOQ or just the brief. Our estimation team replies within two working days.