Skip to content
Build your system

Build your system.

Choose a building and its size, then build it from the ground up or just its MEP. Watch each stage go in with its cost, then download a detailed proposal.

  1. 1Choose the building, its size and where it is
  2. 2Choose what we do
  3. 3Build it and get your estimate
  4. About three minutes
Industrial facility · Full build12,000 m² hall · 5 production lines · 13 m to the roof · DubaiEstimate AED 86.5 to 94.8 m

Drag to turn the building. Build it stage by stage.

How the estimate works

Priced from your choices, stage by stage.

  1. 01

    Built from your choices

    The type, the size, the finish and the emirate set the rate per square foot. A full build shares it across the stages, from the piling to the keys; the MEP only, across the systems.

  2. 02

    Taller costs more

    Above 20 floors the rate rises step by step: deeper piles, a climbing crane, faster lifts and more pumping. A 100-floor tower costs about 40% more per square foot than a 20-floor one.

  3. 03

    A firm price in five working days

    Send your drawings or just the brief. Our estimation team prices the work properly, with the discount we can offer.

What the estimate covers

What is in, and what is not.

Included
  • A full build: everything from the site works and piling to the keys, with the external works
  • The MEP only: supply, installation, testing and commissioning of the systems you choose
  • Authority inspections and the approvals we apply for
  • Handover documents, training and the 12-month defects period
Not included
  • VAT
  • Authority fees, deposits and connection charges
  • Land, finance and your professional fees
  • Design, unless you choose design and build
Talk to us

Rather talk to an engineer?

Book a call with the lead for your sector, or send us your drawings and brief and our estimation team prices the work.